Sunday, 30 October 2011

Plan for filming Spence Level.

Here is a complete plan which we will use in order to get everything prepared and organized for the shooting of our Trailer. We have decided on a date, and that is going to be on the Saturday 5th November.
Equipment:

  • 2 Big Cameras, for filming both the actual trailer, and the actual production and behind the scenes of the trailer filming. 
  • Handheld Camera for shots inside the mine if its not possible for the bigger cameras to do so.
  • Still Camera of pictures of the filming.
  •  Go Cam
  • Boom pole or whatever its called?
  • 2 tripods for the big cameras
  • Handheld Torches/ Spotlights
  • Head torches
  • Technical Equipment: Laptop to edit and analyze footage. Also to upload images taken.
  • Helmets for mine.
  • My car in order to carry equipment.
Clothing: 
  • Waterproof jacket
  • Leggings
  • Fleece
  • Wellies
  • Rucksack for technical equipment
  • Spare clothes.
Cast Equipment/ Clothing:
  • 3x Bikes
  • Cycling Equipment
  • Zippo Lighter 
  • Cycling Clothing - Helmets, gloves, body suit, shoes etc.

    No comments:

    Post a Comment